Historic block of buildings targeted for major renovation

A portion of Coolbaugh street designated as one of Iowa’s three most endangered historic properties may be in line for a major renovation.

Purchased by Ed and Cynthia Bangston in 2007, the buildings located between 204 and 222 E. Coolbaugh had been slated for demolition and deemed unsafe to occupy.

However, prospects for the historic buildings, some of which are more than 100 years old, have improved since the Bangston’s purchased them.

After structural work made the buildings safe to occupy again, Red Oak Concepts moved into one, located at 220 E. Coolbaugh.

Now, the Bangstons hope to bring new life to the block, with the assistance of a Tax Increment Financing (TIF) proposal.

Daric O’Neal, an architect with the Omaha-based firm of Alley Poyner Macchietto, discussed the rehabilitation project with the Red Oak City Council at its Nov. 16 meeting.

“We are developing concepts on how to basically rehabilitate, revitalize these buildings on this entrance corridor to Red Oak’s downtown,” O’Neal said.

The centerpiece to the project would be located at 208-216, where the Bangstons have already secured a lease agreement with the Iowa Area Education Agency.

As per a state mandate to become more efficient, the AEA is closing the Shenandoah office, and creating a regional office in Red Oak.

The AEA currently operates out of a building next to Breadeux Pizza, and employs about 20 people. Under the consolidation, 40 people would work out of the new office, with another 30 located at area schools.

A conference room with an 80-person seating capacity would also be included in the new AEA office, enabling them to host regional educator meetings.

Buildings on either side of the AEA offices, 206 and 218 E. Coolbaugh, would both be renovated into what O’Neal called white or grey boxes. They would be stripped and equipped with new electrical systems, and then prepared for any tenant who wants to use the space.

“These are spaces that could have anything from restaurants to professional services to a retail store,” O’Neal said. “We are getting them prepared for anyone who may be interested.”

O’Neal revealed the Bangstons are already in negotiations with one prospect for one of the “grey” buildings, but nothing has been finalized.

Rehabilitating the first floor of the buildings is Phase One of the project, while turning the second floor into residential housing would be Phase Two.

“Second story housing, in Red Oak over the years, has diminished in quantity and quality,” O’Neal said.

The condo/apartments would include an elevator and covered parking.

In order to facilitate additional parking for the rest of the block, the Bangstons are considering purchasing buildings at 200 and 202 E. Coolbaugh, which would be demolished.

The Bangstons are seeking a TIF agreement, which would allow the city to utilize any additional property taxes collected in the designated properties for the rehabilitation project.

The council voted to allow City Administrator Brad Wright to negotiate with the Bangstons to establish a development agreement.

The Red Oak Express

222 E. Coolbaugh St.
P.O. Box 377
Red Oak, IA 51566
Phone: 712-623-2566 Fax: 712-623-2568

Comment Here